Skip to content

Solution for your property

Industrial Solar

Cut the single largest line item in your production cost

100 kW - 5 MW Factories, warehouses, cold storages, processing units

On a factory shed, the roof is already built, already load-bearing and already unused. A 500 kW system on 40,000 sq ft of shed roof generates roughly 7.3 lakh units a year - and every one of those units is a unit you do not buy at industrial tariff.

How this system works for you

Left to right, this is what actually happens on your site every day.

  1. 1

    Energy audit

    Shift pattern, sanctioned load and power factor are studied first.

  2. 2

    Structural check

    Shed purlin spacing and load-bearing capacity are verified before design.

  3. 3

    High-capacity design

    String sizing, cable routing and LT panel integration are engineered.

  4. 4

    Phased installation

    Work is scheduled around your production so nothing stops.

  5. 5

    Commissioning & O&M

    Testing, DISCOM approval, then scheduled cleaning and maintenance.

Panels Inverter Your load Grid

Free, no obligation

Let us look at your roof and your last twelve bills.

A site survey takes about an hour. You get a written proposal with system size, component makes, generation estimate and payback - and no pressure to sign anything.