100 kW Industrial on-grid Commissioned Feb 2025

Shreeji Industries - 100 kW Rooftop Solar

Shreeji Industries Pvt Ltd MIDC Satpur, Nashik 28 days on site

A 100 kW rooftop system on an auto-component factory shed, covering roughly three-fourths of the unit's daytime consumption.

Shreeji Industries - 100 kW Rooftop Solar

100 kW

System capacity

1.46 lakh units

Annual generation

₹9.7 L lower

Monthly bill impact

75%

Bill reduction

What happened to the electricity bill

Average monthly bill before ₹12,85,000
Average monthly bill after ₹3,15,000
₹9.7 L lower every month ~₹1.16 Cr a year

Figures are this client's actual averages before and after commissioning. Your own result will depend on your tariff, consumption pattern and roof - it will not be identical to this.

The challenge

The shed purlins were spaced wider than standard and the plant could not stop production for even a single shift during installation.

What we did

We ran a structural check first and added intermediate supports where needed, then scheduled all roof work during the Sunday maintenance window across four weekends.

Project notes

Shreeji Industries runs two shifts on a connected load of 250 kVA, with the bulk of consumption between 9 AM and 7 PM. That daytime-heavy profile made the site an almost textbook fit for on-grid solar.

The 100 kW system now generates around 1.46 lakh units a year against an annual consumption of roughly 1.95 lakh units. Monthly bills dropped from an average of Rs 12.85 lakh to Rs 3.15 lakh, and the client claimed 40% accelerated depreciation in the first financial year.

Shed roof before installation
before Shed roof before installation
184 modules installed across the main shed
after 184 modules installed across the main shed